Often the old ways are the best ways.
Category Archives: Uncategorized
Work in progress
The bathroom in the midst of the refit. There’s a new toilet to be fitted, and tiling and panelling to be completed. And then a new floor.
Ship to shore
Zeelands Luister at home on South Dock marina, Greenland Dock on the River Thames, near Surrey Quays, London.